AT HOME UNDERGROUND 

Industry-leading partners in mine water management, delivering high-performance pumps and dependable service. 
Close-up of a lion's face and mane in profile against a black background.

Proven partners in mine water management 

The Ferret pump range is purpose-built for the demanding environments of high-pressure mine dewatering. 
GET IN TOUCH

OUR RANGE

Ferret FPM4

FPM4

Ferret FPM4

MAXIMUM FLOW
7L/sec (111gpm)
MAX OPERATING SPEED
700 rpm
MIN STARTING TORQUE
179N.m
Ferret FP106

FP106

Ferret FP106

MAXIMUM FLOW
20L/sec (317gpm)
MAX OPERATING SPEED
400 rpm
MIN STARTING TORQUE
820N.m
Ferret FP104

FP104

Ferret FP104

MAXIMUM FLOW
20L/sec (317gpm)
MAX OPERATING SPEED
400 rpm
MIN STARTING TORQUE
820N.m
Ferret FP103

FP103

Ferret FP103

MAXIMUM FLOW
20L/sec (317gpm)
MAX OPERATING SPEED
400 rpm
MIN STARTING TORQUE
820N.m
Ferret FP088

FP088

Ferret FP088

MAXIMUM FLOW
14L/sec (222gpm)
MAX OPERATING SPEED
400 rpm
MIN STARTING TORQUE
820N.m
Ferret FP086

FP086

Ferret FP086

MAXIMUM FLOW
14L/sec (222gpm)
MAX OPERATING SPEED
500 rpm
MIN STARTING TORQUE
820N.m
Ferret FP084

FP084

Ferret FP084

MAXIMUM FLOW
14L/sec (222gpm)
MAX OPERATING SPEED
500 rpm
MIN STARTING TORQUE
730N.m
case study

Sand King Pump Station

Greenlands designed and installed the Sand King Mine’s primary portal pump station. It transfers water from underground to the Palmerston Pit for settling, where a pontoon pump returns it to the mine’s water tanks. The project also included the pontoon pump and all connecting pipelines.
client
Ora Banda Mining
scope
  • 2 x FP103 pump skids
  • 2 x 55kW pump starters
  • HDPE pipe line from the Sand King pump station to the Palmerston pit
  • Pontoon pump system installed within the Palmerston pit
  • HDPE pipeline from the Palmerston pit to the Sand King mine water supply tanks
case study

Fimiston Underground Pump Station

Greenlands designed and installed a primary pump station at Fimiston Underground Mine, including two Ferret FP106 pump skids and a rising main connecting to existing infrastructure. HDPE piping was then run from the portal up the pit wall to the settling ponds.
client
Northern Star Resources
scope
  • 2 x FP106 pump skids
  • Pump station control system
  • Twin DN150 steel rising mains
  • 160mm HDPE pipework
case study

Meeka Metals Underground Pumps

Greenlands was contracted to supply 10 x travelling pump systems to dewater the Andy Well underground mine site. The travelling pumps were installed progressively within the underground mine as the water level dropped within the mine.
client
Meeka Metals
scope
  • 10 x FP103 pump skids
  • 10 x 55kW pump starters
  • Operational spares
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.